PMP备考每日试题(211221)
限时免费领取,2022年度公益大课《巧用项目管理轻松突破职业瓶颈》,慧翔天地手把手带你轻松学项目管理,从项目管理小白走向职场巅峰5天课程免费学,快乐成长,更有超低PMP®培训优惠,还有豪礼赠送,详情可以直接点击上方图片进入活动报名页。
每期慧翔天地小编都会附上5~10道PMP®综合测试题,以帮助大家达到练习的效果,本期PMP试题答案会附加在下一期的结尾。大家如果想了解2022年PMP®考试报考流程、报考时间、报考要求、PMP®报考费用、PMP®考试地点、PMP®成绩查询、PMP®报考资格测评等等均可访问站内进行了解。
PMP刷题学习交流QQ群:667625965(点击一键加群)
181、A control chart helps the project manager:
A.focus on the most critical issues to improve quality
B.focus on stimulating thinking
C.explore a desired future outcome.
D.determine if a process is functioning within set limits.
181、控制图有助于项目经理
A.着眼于改进质量最重要的问题上
B.着眼于刺激思考
C.探索理想的结果
D.确定某流程是否正常运转
182、During a project performance review meeting,the project manager shares with the team that actual costs are below the initial estimates and that the schedule is performing well,slightly better than the planned baseline.Using earned value management,how would CPI and SPI indexes perform in Situation like this?
A.CPI>1.0;SPI<1.0
B.CPI>1.0;SPI>1.0
C.CPI<1.0;SPI>1.0
D.CPI<1.0;SPI<1.0
182、在项目绩效审核会上,项目经理告诉团队实际成本低于初始估算,进度执行良好,比计划的基准还稍好一些。在这种情况下使用挣值管理,CPI和SPI的指数的表现如何?
A.CPI>1.0;SPI<1.0
B.CPI>1.0;SPI>1.0
C.CPI<1.0;SPI>1.0
D.CPI<1.0;SPI<1.0
183、Which of the following is a cost of quality?
A.Total costs incurred in Close Procurements
B.Total costs incurred in producing the SOW
C.Total costs of preventing non-conformance to requirements
D.Total costs incurred in producing the WBS
183、下列哪一项属于质量成本?
A.结束采购产生的总成本
B.制定SOW所产生的总成本
C.防止与要求不一致的总成本
D.制作WBS所产生的总成本
184、When communicating with an action-oriented person,a project manager should
A.Be as brief as possible and emphasize the practicality of his of her ideas
B.Provide options,including the pros and cons
C.Remain patient if the other person goes off on tangents
D.Speak as quickly as possible to ensure that all the information is conveyed
184、当与一个行动导向型的人沟通时,项目经理应该
A.尽可能简短,强调他或她的观点的可行性
B.提供可选方案,包括利弊
C.在对方离题时保持耐心
D.尽可能地说得快,保证所有信息传达给对方
185、Which of the following should not be considered when estimating activity durations?
A.Resource capabilities
B.The number of resources assigned to a task
C.Historical data if available
D.Overhead rates
185、当估算活动持续时间时,不应该考虑下列哪项因素
A.资源能力
B.分配到一项任务的资源数量
C.历史信息,如果有的话
D.开销率
(211220)答案
176、C
177、D
178、C
179、C
180、B